Emergency Evacuation Plan Design & Drawings in UAE

Protect your people and stay compliant with UAE Civil Defence requirements. Firestone Fire & Safety Systems designs clear, code-compliant evacuation plans for commercial, residential, and industrial buildings across Abu Dhabi, Dubai, Sharjah, and Al Ain.

exit plan image
Get a free site visit

Why Every Building Needs a Certified Evacuation Plan

A clear evacuation plan isn't just a compliance checkbox — it's what gets people out safely during an emergency. UAE Civil Defence authorities (ADCD, DCD, SCD, and Hassantuk-linked SIRA requirements) mandate approved evacuation layouts for occupied buildings, and outdated or missing plans are one of the most common reasons for failed inspections.Firestone has been designing and installing evacuation systems since 2007, with Category A approvals across all four emirates we serve.

evacuation plan image

our evacuation paln services and process

1
2
3
4
5

Request an assessment

Tell us your building type, size and location.

Site visit or drawing review

We assess layout, exits and code requirements.

Draft evacuation plan

We produce a 2D or 3D draft layout for review.

Revisions and approval

We adjust based on feedback and Civil Defence rules

Final delivery and installation

Approved plans are printed, mounted and documented.

Site survey

Map layout, exits and hazardzones on site

2D drawings

Wall-mountable exit routelayouts

3D Drawings

Isometric layouts for multi-level buildings.

Photoluminescent

Glow-in-dark signage for lowvisibility.

Civil Defence compliance

ADCD, DCD & SCD submission support

Signage installation

Approved evacuation plan mounting
Is an evacuation plan legally required in the UAE? +

Yes. UAE Civil Defence authorities require occupied buildings to display an approved evacuation plan as part of fire safety compliance.

How long does it take to get an evacuation plan designed? +

Turnaround depends on building size and complexity, but standard layouts are typically completed within a few working days of the site assessment.

Do you provide evacuation plans for construction sites? +

Yes, we design evacuation layouts for active construction sites as well as completed buildings.

What's the difference between a 2D and 3D evacuation plan? +

A 2D plan is a flat, top-down layout showing exits and routes. A 3D plan uses an isometric view, which many building occupants find easier to read at a glance, especially in complex or multi-floor buildings.

Do you handle Civil Defence submission and approval? +

Yes, our plans are prepared to meet ADCD, DCD, and SCD documentation standards to support your approval process.

why choose firestone

Operating since 2007, 4 emirates

Category A: ADCD, DCD, SCD, SIRA

End-to-end fire and life safety since 2007, 4 emirates

Fast turnaround on layouts

Sectors: commercial to construction

Looking for Reliable fire and  Safety Solutions?

We deliver certified Fire and security systems tailored to your facility’s needs.